Tristram Precinct
Livingston Building choose CoBuilt to complete acoustic and insulation treatments on the Waikato Regional Council building. The project consisted of installing three systems: Mammoth, GreenStuf®, and Knauf.
The job consisted of two major components: thermal insulation for ceilings and walls, as well as acoustic treatments. Over 15,000 square meters were covered with insulation, including a special treatment for the basement that involved wrapping beams and pillars to reduce noise from the railway tunnel beneath. These acoustic treatments also extended throughout the rest of the building.
The end result? A comfortable and quiet space for employees to work in. This project is just one example of CoBuilt’s capability to deliver acoustic treatment and insulation efficiently and to specs in buildings of all sizes.